Projects

Project List

Architecture

Hearst Hotel – San Francisco, California

Entitlement/Schematic Design for adaptive reuse of the historic 13-fl building, including change of use from office to hotel, seismic upgrade, roof decks; 160,000 SF.

100 & 150 Hooper – San Francisco, California

Office and light industrial (PDR zoning), three-building complex in the Dogpatch/Design District neighborhood; SFMade partnership; 450,000 SF.

The Battery – San Francisco, California

Seismic upgrade, restoration work and building expansion of a high-end private club including private penthouse, custom glass curtain walls, and a first-of-its-kind glass floor elevator with glass counterweight; 57,000 SF.

459 Geary/Chandran Gallery – San Francisco, California

Shell and core renovation of a historic 6-fl plus basement commercial building featuring creative office space, art gallery and private rooftop residence; 20,150 SF.

Recology – San Francisco, California

Build out of organic waste processing facility; 14,000 SF. Master planning for state-of-the-art consolidated waste recovery facility – Tunnel Road site.

Britex Fabrics – San Francisco, California

Extensive renovation and seismic upgrade of an un-reinforced masonry building, including updated interiors; 14,000 SF.

Cathedral School for Boys – San Francisco, California

Design of two additions that infill existing exterior courts, creating two new entrances and additional program space. Design of classroom addition to house two homerooms, computer lab, recording studio, and roof deck.

Stonebrae Elementary School – Hayward, California

Oversaw Design Development through construction of a multi-building developer-built public elementary school in the Hayward hills.

Shipways Office Building, Marina Village Business Park – Alameda, Califorina

Design for a four-story speculative office building; 143,000 SF.

Rafael Film Center – San Rafael, California

CA and coordination for the restoration, seismic upgrade, and addition to a historic Art Deco theater converted it into a state-of-the-art 3-screen film complex; 20,000 SF.

The Brannan – San Francisco, California

Served as Project architect, overseeing detailing and coordination efforts for the first phase of a 19-story, high-rise luxury condominium project.

Oakland Arena Renovation – Oakland, California

Major renovation and expansion of 19,200-seat sports arena. Design coordination and detailing of the three additions/entrances of the design-build, fast-track renovation project.

Ogawa Plaza – Oakland, California

Served as Project Architect, coordinated and detailed numerous architectural elements and paving systems for a major civic plaza.

Ultimar Phase 3 – Clearwater, Florida

Job Captain for the final phase of a high-rise condominium on Sand Key

Interiors and Tenant Improvements

Phantom Ales Distillery, Anaheim, California 

Conversion of existing BOH space into small batch distillery operations, 1000 SF

Seven Stills Distillery and Tap Room – San Francisco, California

Served as Project Manager/Project Architect for a startup craft distillery in conjunction with in-house restaurant:14,000 SF.

Ample – San Francisco, California

Served as Project Manager/Project Architect for an EV battery manufacturer’s expanded office, R&D, and prototyping facility at 100 Hooper: 16,000 SF.

600 California Lobby Remodel – San Francisco, California

Lead designer for hospitality-inspired lobby improvements: 4,500 SF.

180 Montgomery Street – San Francisco, California

Designer and Project manager of a unique lobby renovation for the purpose of updating the building’s image and marketplace viability, 3,000 SF.

Cathedral School for Boys, Gymnasium Renovation – San Francisco, California

Renovation of existing facility located in the historic Crypt level of Grace Cathedral: 46,500 SF.

Cathedral School for Boys, Gresham Hall Renovation – San Francisco, California

Renovation of the School’s auditorium included the addition of a commercial kitchen: 45,100 SF.

Single-Family Residential

Design Everest, California

Competed in 12 permit sets for various project types, ADUs/cottages, major renovation and additions, and ground-up. Responsible for evaluation, scoping, and pricing of roughly 75 residential projects ranging from multi-family to remodeling. 

Robert Sheppard Construction, Greensboro, North Carolina

Produced 30 permit sets of spec and customer homes.

Golf Residence, Cary, North Carolina

Design, permitting, and construction of an addition and remodel.

Carleton Residence, Panama City, Florida

1500 SF addition to waterfront historic home.

Feasibility Studies

Folsom Street Multi-Family – San Francisco, California

A multi-family dentistry study performed on behalf of the seller.

Harrison Street at 4th Mixed Uses – San Francisco, California

Developed multiple massing/density studies for an 800,000 SF high-rise development for a developer client’s pre-purchase assessment.

Harrison Street Mixed-use/Residential – San Francisco, California

Produced density study for a 70,000 SF, 51-unit building on behalf of the seller.

130 Townsend – San Francisco, California

Conceptual design for a developer potential buyer for an office building project.

Takahashi Building – San Francisco, California

Study for a light industrial conversion of a historic multi-story warehouse for pre-purchase assessment.

Cruise – San Francisco, California

Conceptual design tenant’s pre-lease evaluation for office and R&D facility.

Design Everest, California

Responsible for evaluating, scoping, and pricing roughly 50 commercial, multi-family, and industrial projects. 

Scroll to Top